Decision model · Salem Township, PA

Amazon and Talen’s PHL 100 data-center campus, Salem Township, Pennsylvania

Amazon’s PHL 100 campus in Salem Township has a consumptive-use approval based on a 30-day average. Talen’s power arrangements have their own qualified scope. Installed cooling and same-period water consumption remain unverified. Next steps require metering, monitoring and service records before compliance or usable electricity can be established.

Last updated at: Oct 20, 2026

Salem TownshipPENNSYLVANIA
Approximate locality · not site boundaries

Stakeholders

Community and ratepayer groups

Will PHL 100 meet its actual water and environmental duties while substantiating electricity-cost protection?

What our analysis finds

The alternate cooling-budget calculation inverts owned consumptive coefficients and incidental-use allocations into hypothetical average IT load. It is supporting design sensitivity, not an estimate of installed cooling capacity. Actual compliance requires total consumption on the approval’s same 30-day-average basis. Power arrangements and electric-cost protection remain separate from the water approval.

For community and ratepayer groups: A hypothetical cooling load and a water approval do not establish actual environmental protection or covered customer costs.

Inventurist analysis of public sources; not advice.

Outcomes at stake

Where each outcome stands, and the next decision that affects it

Community impact

Unknown

Unknown

Unknown

Unknown

Local economy

Unknown

Decision timeline

Decisions taken and decisions ahead. Open a step to see the parties, their options and the outcomes at stake.

✓ decided · × not taken · ◆ Expected · ★ Best move (Based on AI analysis; not advice; not reviewed or signed.)

  1. Mar 12, 2026 · decided

    Modified PHL100 consumptive-use approval

    Outcomes at stake:
  1. Date not set · decision ahead

    Clarify the metering and reporting record

    Outcomes at stake:
  2. Date not set · decision ahead

    Clarify installed cooling and design scope

    Outcomes at stake:
  3. Date not set · decision ahead

    Clarify power scope and delivered service

    Outcomes at stake:

Use this decision model in your work.

Discuss buying this model for your selected stakeholder view.

Illustrative decision model grounded in public sources. Hypothetical choices and effects are distinct from recorded events.

Amazon and Talen’s PHL 100 data-center campus, Salem Township, Pennsylvania | Inventurist