Decision model · Tulsa, OK
Meta’s Anthem data-center campus, Tulsa, Oklahoma
Meta is developing the Anthem data-center campus in Tulsa with Atmoss as landowner. Planning records cover about 339 acres. Owner-signed easements and planning actions leave municipal acceptance and service readiness unresolved. Next steps are to establish the applicable infrastructure, final-plat and utility records.
Last updated at: Oct 20, 2026
Stakeholders
Community and ratepayer groups
What evidence would show that Anthem protects Tulsa water, services and local employment interests?
What our analysis finds
Planning permission and owner-signed easements do not establish municipal acceptance or completed infrastructure. The record does not establish a matching electrical-service rating. Water and employment announcements remain separate from observed performance. The local-program timing calculation is a hypothetical cost sensitivity, not actual borrowing or a measured public benefit.
For community and ratepayer groups: Annual water use, local hiring and completed public infrastructure remain unverified despite the announced program.
Inventurist analysis of public sources; not advice.
Outcomes at stake
Where each outcome stands, and the next decision that affects it
Community impact
Unknown
Not measured · No matched utility rating or power factor is established; acreage and a substation plan do not establish supply.
For: Meta Platforms Inc., Public Service Company of Oklahoma
Actual project-matched usable electrical supply.
- What is unknown
- Usable campus electricity, including megawatts and service dates.
- Why
- No matched utility rating or power factor is established; acreage and a substation plan do not establish supply.
- What would resolve it
- Executed project service terms and matching electrical ratings, energization and delivery records.
Related decisions and context
Unknown
Not measured · Staff references to security and owner-signed easements do not establish the instrument, deposit or municipal acceptance.
For: Atmoss LLC, Meta Platforms Inc., Tulsa Metropolitan Area Planning Commission
Completed and accepted applicable local infrastructure, including IDP197415scope.
- What is unknown
- Whether the required water, roads and other local infrastructure is completed and accepted.
- Why
- Staff references to security and owner-signed easements do not establish the instrument, deposit or municipal acceptance.
- What would resolve it
- Accepted infrastructure plans, executed security and easement records, and completion inspections.
0 USD (range 0–843,750)
Informs this result. Supporting sensitivity only: whole precommitment flag1/0 ×owned25mUSD ×speculative6.75%annual rate ×0/3/6months/12 gives0/421875/843750USD, zero if freely deferrable. Not actual loan, escrow/IDPsecurity, deposit timing, extra lifetime interest, actual cost, net benefit or capital adequacy.
Related decisions and context
Unknown
Not measured · A preliminary extension and accelerated release do not establish an executed final plat; owner execution remains unresolved.
For: Atmoss LLC, Tulsa Metropolitan Area Planning Commission, Tulsa City Council
Permission and final-plat conditions for the relevant Anthem phase.
- What is unknown
- Whether applicable phase-specific development permissions are fulfilled.
- Why
- A preliminary extension and accelerated release do not establish an executed final plat; owner execution remains unresolved.
- What would resolve it
- The executed final plat and the municipal approvals applicable to each phase.
Related decisions and context
Unknown
Not measured · Closed-loop cooling and a claim of zero water use for most of the year do not establish annual totals or sufficiency.
For: Meta Platforms Inc., Public Service Company of Oklahoma, Tulsa Metropolitan Area Planning Commission
Actual water use and service outcomes under the applicable campus configuration.
- What is unknown
- Annual campus water use and the service volume available for local needs.
- Why
- Closed-loop cooling and a claim of zero water use for most of the year do not establish annual totals or sufficiency.
- What would resolve it
- Metered annual use and design demand matched to service capacity and applicable terms.
Related decisions and context
1 more related decisions
Local economy
Unknown
Not measured · Projected peak construction and operating jobs and training programs do not establish observed local hiring.
For: Meta Platforms Inc., Tulsa City Council
Observed local construction and operational employment benefits.
- What is unknown
- Local construction and operating employment actually delivered, by reporting period.
- Why
- Projected peak construction and operating jobs and training programs do not establish observed local hiring.
- What would resolve it
- Dated employer records distinguishing construction, operations and local hires.
Related decisions and context
Decision timeline
Decisions taken and decisions ahead. Open a step to see the parties, their options and the outcomes at stake.
✓ decided · × not taken · ◆ Expected · ★ Best move (Based on AI analysis; not advice; not reviewed or signed.)
Mar 25, 2026 · decided
Citywide moratorium adopted; Anthem phases1and2 exempt
Outcomes at stake:May 20, 2026 · decided
Anthem plat extension and accelerated release approved
Outcomes at stake:TODAY · Oct 20, 2026
Dec 2026 · decision ahead
Reported citywide moratorium end, month precision
Date not set · decision ahead
Clarify infrastructure and acceptance records
Outcomes at stake:Date not set · decision ahead
Document local-program commitments
Outcomes at stake:Date not set · decision ahead
Clarify matched electric-service scope
Outcomes at stake:
Use this decision model in your work.
Discuss buying this model for your selected stakeholder view.
Illustrative decision model grounded in public sources. Hypothetical choices and effects are distinct from recorded events.